homepage  |  Favorites  |  Chinese  |   weixin
Current position -> News -> Access to information

Access to information

Promoting safety through quality and striving for high-quality engineering
The publisher£ºczszjs    Release time£º2023-11-28    Hit£º687

 To ensure construction quality, the Eighth Branch strictly follows the design documents and regulatory standards in all stages and processes of project construction. In the steam pipeline renovation project of Meijie Branch Line on both sides of Tengda Road and north side of Zouhe Road, the total length of the steam pipeline is about 1213m. It is buried along the planned Zongqi Road to the north of Yangjiacun Road, buried along the north of Yangjiacun Road, and finally to Meijie Medical. Steam pipelines belong to pressure pipelines, and their installation quality is directly related to production and life safety. Therefore, the subsidiary has arranged experienced project managers to strictly implement project management in various aspects such as personnel, materials, and construction methods to ensure the construction quality of this installation project.

The project department conducts full process quality management of the project. Before construction, we actively prepare for the installation of steam pipelines. We first inform the quality and technical supervision department responsible for pipeline use registration in the location of the pipeline installation project in writing; Conduct inspections on pipeline components and support components; Simultaneously carry out valve inspection work. During the pipeline installation phase, we pay attention to the following quality control points: installation of pipeline supports, pipeline welding, installation of square compensators, pressure testing and blowing to meet regulatory requirements.
The project department implements construction quality acceptance control: the technical director or full-time quality inspector is responsible for the sub item acceptance, and the foremen of each specialty are responsible for mutual inspection and handover inspection between specialties; After the construction of the concealed works is completed, the concealed acceptance work should be carried out before the upper layer of construction, and imaging data should be taken and recorded. The project department should organize the engineering data completely, and report it to the resident supervisor in advance on the basis of passing the pre inspection. After the resident supervisor inspects the data and engineering and passes the inspection, the next layer of construction can be carried out; After the completion of the project, the project department shall prepare internal materials in advance according to relevant requirements and report them to the supervisor and the owner after passing the self inspection.
Steam pipelines belong to the pressure pipelines specified in the Regulations on Safety Supervision of Special Equipment. Therefore, steam pipelines must be constructed strictly in accordance with relevant specifications and design documents to ensure the safe and reliable operation of pipeline equipment. Quality promotes safety in order to ensure the safety of the production process and subsequent use. Strict quality control should be kept in mind by every engineer.
¡¡
¡¡

Print this page || Close the window

Jiangsu province Changzhou City Blue Ocean 158 North Road| Zip code£º213017 | Telephone£º0086-0519-85501558 |¡¡Fax£º0086-0519-85501558 |¡¡E-mail£ºczsz@czszjt.com

Copyright © CHANGZHOU MUNICIPAL ADMINISTRATION CONSTRUCTION ENGINEERING CO.,LTD.  ËÕICP±¸12078434ºÅ-1   Technical support:Public science and technology